Disaster Funding
Recover the federal funding you are owed after a declared disaster.
Overview
After a FEMA disaster declaration, electric utilities are eligible for Public Assistance reimbursement for emergency protective measures and permanent restoration work. The difference between full reimbursement and a partial denial is almost always documentation quality. Power-View captures the project records, cost data, and asset documentation FEMA requires — and GridIntel’s specialists help navigate the PA process from start to finish.
What's included
- Pre-disaster baseline documentation of infrastructure condition
- Real-time cost capture during emergency response operations
- Photo and GPS damage documentation linked to specific assets in Power-View
- FEMA Public Assistance project worksheet preparation and review
- Appeals support with fully organized evidence packages
- Coordination with experienced FEMA PA process specialists
Key benefits
Why organizations choose GridIntel for Disaster Funding
Maximum reimbursement recovery
Thorough documentation prevents FEMA from reducing or denying legitimate reimbursement claims.
Faster claim submission
Organized Power-View records dramatically compress the time required to compile FEMA documentation.
Pre-disaster preparation
Establish baseline records before the next storm to strengthen any subsequent FEMA claim.
Expert process navigation
GridIntel specialists manage the PA process while your team stays focused on restoration.
Empower your grid with GridIntel
Backed by decades of utility expertise. Built by power engineers, for power professionals.